LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2022 >> Spark ACTIV, Standard Trans >> Repair and Diagnosis >> Brakes >> Mechanical - Hydraulic >> Hydraulic Brakes >> Repair Instructions >> Brake Pressure Modulator Valve Primary Pipe Replacement (RHD) >> Installation Procedure

Installation Procedure

  1. GM4007723Courtesy of GENERAL MOTORS COMPANY

    Install the brake pressure modulator valve primary pipe (1) to the vehicle.

  2. Attach the brake pressure modulator primary pipe (1) to the brake pipe clips (2).
  3. GM4007721Courtesy of GENERAL MOTORS COMPANY
    CAUTION:

    Refer to Fastener Caution .

    Connect the brake pressure modulator valve primary pipe fitting (1) to the brake pressure modulator valve and tighten to 18 N.m (13 lb ft).

  4. GM4007719Courtesy of GENERAL MOTORS COMPANY

    Connect the brake pressure modulator valve primary pipe fitting (1) to the master cylinder and tighten to 18 N.m (13 lb ft).

  5. GM3998900Courtesy of GENERAL MOTORS COMPANY

    Connect the electrical connector (1) from the EBCM and BPMV assembly (2).

  6. Install the battery tray. Refer to Battery Tray Replacement (without Engine Block Heater) , or Battery Tray Replacement (with Engine Block Heater) .
  7. Install the engine control module. Refer to Engine Control Module Replacement .
  8. Install the battery. Refer to Battery Replacement .
  9. GM4085988Courtesy of GENERAL MOTORS COMPANY

    Attach the push clip (1) to the front compartment side rail and attach the fuel feed pipe (3) to the fuel feed pipe clip (2).

  10. Install the air cleaner outlet duct. Refer to Air Cleaner Outlet Duct Replacement .
  11. Install the air cleaner assembly. Refer to Air Cleaner Assembly Replacement .
  12. Bleed the hydraulic brake system. Refer to Hydraulic Brake System Bleeding (Manual) , or Hydraulic Brake System Bleeding (Pressure) .