LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2022 >> Spark ACTIV, Standard Trans >> Repair and Diagnosis >> Brakes >> Mechanical - Hydraulic >> Hydraulic Brakes >> Repair Instructions >> Brake Pressure Modulator Valve Primary Pipe Replacement (LHD) >> Removal Procedure

Removal Procedure

WARNING:

Refer to Brake Fluid Irritant Warning .

  1. Remove the battery. Refer to Battery Replacement .
  2. Remove the engine control module. Refer to Engine Control Module Replacement .
  3. Remove the battery tray. Refer to Battery Tray Replacement (without Engine Block Heater) , or Battery Tray Replacement (with Engine Block Heater) .
  4. Clean all dirt and foreign material from the brake pipe fittings.
  5. GM4007709Courtesy of GENERAL MOTORS COMPANY

    Disconnect the brake pressure modulator valve primary pipe fitting (1) from the master cylinder and drain the brake fluid out of the master cylinder.

  6. Disconnect the brake pressure modulator valve primary pipe fitting (2) from the brake pressure modulator valve.
  7. Remove the brake pressure modulator valve primary pipe (3) from the vehicle.