Installation Procedure
Front Brake Pipe (1) @ Vehicle - Install
- Front Brake Pipe (1) @ Brake Pipe Clip (2) - Install
Front Brake Pipe (1) @ Brake Pipe Clip (2) - Install [ 2x ]
Front Brake Hose Retainer (2) - Install
- Front Brake Pipe Fitting (1) @ Front Brake Hose (3) - Install and tighten 18 N.m (13 lb-ft)
Front Brake Pipe Fitting (1) @ Brake Pressure Modulator Valve (2) - Install and tighten 18 N.m (13 lb-ft)
Drive Motor Battery Positive and Negative Cable (1) - Install - Drive Motor Battery Positive and Negative Cable Replacement
- Install the heater surge tank to the heater surge tank bracket. Heater Coolant Surge Tank Replacement
- Front Wheelhouse Liner-Right Side @ Vehicle - Install - Front Wheelhouse Liner Replacement
- Enable the high voltage system. High Voltage Enabling
- Bleed the brake system. Hydraulic Brake System Bleeding
CAUTION:
Refer to Fastener Caution .