LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2020 >> Express 2500 LS, 6.0L Eng VIN G >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 1 (Automatic Transmission - 8L90 (M5U MQD) - Repair Instructions - On Vehicle) >> Repair Instructions - On Vehicle >> Transmission Converter Cover Replacement (Right) >> Installation Procedure

Installation Procedure

WARNING: This page is about a different variant/trim than selected.
  1. GM4843873Courtesy of GENERAL MOTORS COMPANY

    Install the starter (1) with the right side flywheel inspection cover.

  2. CAUTION:

    Refer to Fastener Caution

  3. Starter Mounting Bolt (2) - Install and tighten [2x] 50 N.m (37 lb ft)
  4. GM5106440Courtesy of GENERAL MOTORS COMPANY

    Install the right side flywheel inspection cover bolt (1) and tighten to 9 N.m (80 lb in)

  5. GM4858426Courtesy of GENERAL MOTORS COMPANY

    Engine Oil Cooler Pipe (1) - Install - Engine Oil Cooler Pipe Replacement (LWN) , or Engine Oil Cooler Pipe Replacement (LV1)

  6. GM4843872Courtesy of GENERAL MOTORS COMPANY

    Battery Positive Cable (1) - Install

  7. Battery Positive Cable Nut (2) - Install and tighten 14 N.m (124 lb in)
  8. Electrical Connector (4) @ Starter Solenoid - Connect
  9. Protective Sleeve (3) - Reposition
  10. GM4843649Courtesy of GENERAL MOTORS COMPANY

    Starter Heat Shield (4) - Install - Starter Shield Replacement (LV1)

  11. Lower the vehicle.
  12. Connect the negative battery cable. Battery Negative Cable Disconnection and Connection (Single Battery) , or Battery Negative Cable Disconnection and Connection (Dual Battery)