LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2020 >> Express 2500 LS, 6.0L Eng VIN G >> Repair and Diagnosis >> External Pages >> Different car >> Section 15 (Battery, Starting System And Charging System) >> Repair Instructions >> Starter Replacement (L96, LC8) >> Installation Procedure

Installation Procedure

WARNING: This page is about a different car, the 2019 GMC Savana 3500, 2019 GMC Savana 2500, 2019 Chevrolet Express 3500, and 2019 Chevrolet Express 2500. However, it is still accessible from the selected car via links, so may be relevant.
  1. GM4603202Courtesy of GENERAL MOTORS COMPANY

    If necessary, install the starter heat shield (2) to the starter solenoid (1).

  2. GM4603102Courtesy of GENERAL MOTORS COMPANY

    Install the transmission cover (2) and the starter (3) into position on the flywheel.

  3. Transmission Cover Bolt(1) - Install and tighten12 N.m (106 lb in)
  4. GM4603107Courtesy of GENERAL MOTORS COMPANY

    Starter(3) - Install

  5. CAUTION:

    Refer to Fastener Caution .

  6. Starter Bolt(1) - Install and tighten[2x]50 N.m (37 lb ft)
  7. Electrical Connector(2) - Connect
  8. GM4603106Courtesy of GENERAL MOTORS COMPANY

    Battery Positive Cable(1) - Install

  9. Battery Positive Cable Nut(2) - Install and tighten9 N.m (80 lb in)
  10. Lower the vehicle.
  11. Connect the battery negative cable. Battery Negative Cable Disconnection and Connection (Single Battery) Battery Negative Cable Disconnection and Connection (Dual Battery)