Installation Procedure
WARNING: This page is about a different car, the 2017 Chevrolet Spark. However, it is still accessible from the selected car via links, so may be relevant.
- Install the brake pressure modulator valve primary pipe (1) to the vehicle.
- Attach the brake pressure modulator primary pipe (1) to the brake pipe clips (2).
- Connect the brake pressure modulator valve primary pipe fitting (1) to the brake pressure modulator valve and tighten to 18 N.m (13 lb ft).
- Connect the brake pressure modulator valve primary pipe fitting (1) to the master cylinder and tighten to 18 N.m (13 lb ft).
- Connect the electrical connector (1) from the EBCM and BPMV assembly (2).
- Install the battery tray. Refer to Battery Tray Replacement (without Engine Block Heater)Battery Tray Replacement (with Engine Block Heater) .
- Install the engine control module. Refer to Engine Control Module Replacement .
- Install the battery. Refer to Battery Replacement .
- Attach the push clip (1) to the front compartment side rail and attach the fuel feed pipe (3) to the fuel feed pipe clip (2).
- Install the air cleaner outlet duct. Refer to Air Cleaner Outlet Duct Replacement (L5Q)Air Cleaner Outlet Duct Replacement (LV7) .
- Install the air cleaner assembly. Refer to Air Cleaner Assembly Replacement .
- Bleed the hydraulic brake system. Refer to Hydraulic Brake System Bleeding (Manual) Hydraulic Brake System Bleeding (Pressure) .
CAUTION:
Refer to Fastener Caution .