LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2018 >> Equinox L >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 24 (Automatic Transmission - 9T45 (M3U) Or 9T50 (M3D M3H) - Repair Instructions - Off Vehicle) >> Repair Instructions - Off Vehicle >> Control Valve Body Assembly Installation (With ETRS) >> Control Valve Solenoid Body Wiring Harness Installation

Control Valve Solenoid Body Wiring Harness Installation

WARNING: This page is about a different variant/trim than selected.
Fig 1: Control Valve Solenoid Body Wiring Harness
GM4572673Courtesy of GENERAL MOTORS COMPANY
Control Valve Solenoid Body Wiring Harness Installation

Callout Component Name
1 Automatic Transmission Fluid Temperature Sensor Seal
Procedure 
Install NEW seals. Do NOT reuse old seals.
2 Automatic Transmission Wiring Harness
Procedure 
Ensure you connect all the connectors to the valve body.
Tighten 
8 N.m (71 lb in)
NOTE:

The bolts are captured with harness.

3 Control Valve Solenoid Body Bolt
Tighten in sequence 
9 N.m (80 lb in)
Procedure 
Hand tighten and follow torque sequence below.
4 Control Valve Body Bolt (Qty: 3)
Procedure 
Hand tighten and follow torque sequence below.