Installation Procedure
WARNING: This page is about a different car, the 2015 Chevrolet Malibu. However, it is still accessible from the selected car via links, so may be relevant.
- For cylinder head assemble. Refer to Cylinder Head Assemble (LKW) .
- Install the cylinder head gasket (3) to the block.
NOTE: Do not use any sealing material.
- Install the cylinder head (2). Ensure the number 1 cylinder is at top dead center (TDC). The key on the crankshaft should be on top in the 12 o'clock position.
- Install the cylinder head bolts.
CAUTION: Refer to Fastener Caution .NOTE: Always use NEW cylinder head bolts.
- Tighten the bolts in sequence to 30 N.m (22 lb ft).
- Tighten the bolts an additional 190 degrees in sequence using the EN 45059 meter.
- Install the exhaust valve rocker arm. Refer to Exhaust Valve Rocker Arm Replacement (LKW) .
- Install the fuel pump. Refer to Fuel Pump Replacement .
- Install the intake valve rocker arm. Refer to Exhaust Valve Rocker Arm Replacement (LKW) .
- Install the exhaust manifold. Refer to Exhaust Manifold Replacement (LKW) .
- Install the intake manifold. Refer to Intake Manifold Replacement (LKW) .
- Refill the engine with NEW oil. Refer to Engine Oil and Oil Filter Replacement .
- Refill the coolant system. Refer to Cooling System Draining and Filling (GE 47716) and Cooling System Draining and Filling (Static) .