LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2015 >> Malibu LS >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> Engine Mechanical - 2.0L (LTG) Or 2.5L (LKW) - Repair Instructions - Off Vehicle >> Repair Instructions - Off Vehicle >> Intake Manifold Installation (LKW) >> Intake Manifold and Components

Intake Manifold and Components

Fig 1: Intake Manifold & Components (LKW)
GM2964003Courtesy of GENERAL MOTORS COMPANY
Intake Manifold and Components

Callout Component Name
1 EVAP Canister Valve Tube
2 Intake Manifold Gasket
3 Intake Manifold
4 Intake Manifold Bolts (Qty: 6)
CAUTION: Alternately hand-tighten the fuel pump bolts one turn at a time until the pump is fully seated. Trying to draw down the pump without even side-to-side tightening may result in pump plunger damage.
CAUTION: Refer to Fastener Caution .
NOTE: Tighten the bolts in sequence.

Tighten 
12 N.m (106 lb in)
5 Throttle Body Gasket
6 Throttle Body
7 Throttle Body Bolts (Qty: 4)
Tighten 
10 (89 lb in)
8 MAP Sensor
9 MAP Sensor Bolt
Tighten 
5 N.m (44 lb in)
10 EVAP Canister Valve