Installation Procedure
WARNING: This page is about a different variant/trim than selected.
- Install a NEW secondary air injection check valve gasket (1).
- Install the secondary air injection check valve (2).
- Install the 3 secondary air injection check valve bolts (3) and tighten to 22 N.m (16 lb ft).CAUTION: Refer to Fastener Caution .
- Connect the secondary air injection pump pipe (1) to the secondary air injection check valve (2). Refer to Plastic Collar Quick Connect Fitting Service .
- Connect the battery negative cable. Refer to Battery Negative Cable Disconnection and Connection .