LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2015 >> Cruze LT, Automatic Trans >> Repair and Diagnosis >> Engine Mechanical >> Engine Mechanical - 1.4L (LUV) >> Repair Instructions - On Vehicle >> Camshaft Intake Sprocket Replacement >> Installation Procedure

Installation Procedure

  1. Insert the intake camshaft sprocket to the engine to engine front cover and timing chain.
  2. Install the 2 camshaft sprockets (2) along with the timing chain (1) to the camshafts.
    Fig 1: Timing Chain And Camshaft Sprockets
    GM2191431Courtesy of GENERAL MOTORS COMPANY
  3. Install the 2 camshaft sprocket bolts (2) and the 2 camshaft position exciter wheels (1).
    Fig 2: Camshaft Position Exciter Wheels And Camshaft Sprocket Bolts
    GM2191382Courtesy of GENERAL MOTORS COMPANY
  4. Remove EN-955-10  pin to apply tension to the timing chain.
  5. Tighten the 2 camshaft sprockets. Refer to Camshaft Timing Chain Adjustment .
    NOTE: Engine must be adjusted to TDC.
  6. Remove all special tools for timing chain adjustment. Refer to Camshaft Timing Chain Adjustment .
  7. Install the upper timing chain guide (2).
    Fig 3: Upper Timing Chain Guide And Bolts
    GM2190676Courtesy of GENERAL MOTORS COMPANY
  8. Install the 2 upper timing chain guide bolts (1) and tighten to 8 N.m (71 lb in).
    CAUTION: Refer to Fastener Caution .
  9. Install the 2 camshaft position actuator solenoid valves. Refer to Camshaft Position Actuator Solenoid Valve Installation .
  10. Install the camshaft cover. Refer to Camshaft Cover Replacement .
  11. Install the timing chain tensioner plug and tighten to 50 N.m (37 lb ft).
  12. Install the air cleaner assembly. Refer to Air Cleaner Assembly Replacement .
  13. Check and correct engine oil level.
  14. Close the hood.