Evaporative Emission Front Pipe Replacement (LKW)
Evaporative Emission Front Pipe Replacement (LKW)
| Callout | Component Name |
|---|---|
|
Preliminary Procedure
|
|
| 1 | Evaporative Emission Front Pipe Procedure Disconnect the evaporative emission front pipe from the purge valve and line. Refer to Plastic Collar Quick Connect Fitting Service . |