Installation Procedure
- Install the intake manifold gasket (1).
- Install the intake manifold (2).
- Hand start the intake manifold bolts (1).
- Tighten the fastener in sequence twice to 12 (106 lb in).
- Install the fuel pump. Refer to Fuel Pump Replacement .
- Install the throttle body. Refer to Throttle Body Assembly Replacement (LTG) .
- Install the EVAP Canister Purge Solenoid Valve (1).
- Install the brake vacuum pipe (1). Refer to Power Brake Booster Vacuum Pipe Replacement (LTG, LKW) .
- Install the PCV pipe (2). Refer to Positive Crankcase Ventilation Hose/Pipe/Tube Replacement (Camshaft Cover to Air Cleaner Resonator to Outlet Duct) .
- Install the charge air cooler outlet tube. Refer to Charge Air Cooler Outlet Air Tube Replacement (LTG) .
- Connect the fuel feed pipe. Refer to Fuel Feed Front Pipe Replacement (LTG) .
- Install the intake manifold cover. Refer to Intake Manifold Cover Replacement (LTG) .
CAUTION:
Refer to Fastener Caution .