LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2014 >> Malibu LS >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> Engine Mechanical - 2.0L (LTG) Or 2.5L (LKW) - Repair Instructions - On Vehicle >> Repair Instructions - On Vehicle >> Intake Manifold Replacement (LKW) >> Installation Procedure

Installation Procedure

    Fig 1: Intake Manifold Gasket
    GM2815742Courtesy of GENERAL MOTORS COMPANY
  1. Install the intake manifold gasket (1).
  2. Fig 2: Intake Bolts
    GM2815536Courtesy of GENERAL MOTORS COMPANY
  3. Install the intake manifold (2).
  4. Hand start the intake manifold bolts (1).
  5. Fig 3: Tightening Fastener In Sequence
    GM2726735Courtesy of GENERAL MOTORS COMPANY
    CAUTION:

    Refer to Fastener Caution .

  6. Tighten the fastener in sequence twice to 12 (106 lb in).
  7. Install the fuel pump. Refer to Fuel Injection Fuel Rail Assembly Replacement .
  8. Install the throttle body. Refer to Throttle Body Assembly Replacement (LKW) .
  9. Fig 4: EVAP Canister Valve
    GM2726730Courtesy of GENERAL MOTORS COMPANY
  10. Install the EVAP canister valve (1).
  11. Fig 5: Brake Vacuum Pipe
    GM2815535Courtesy of GENERAL MOTORS COMPANY
  12. Install the brake vacuum pipe (1). Refer to Power Brake Booster Vacuum Pipe Replacement (LTG, LKW) .
  13. Fig 6: PCV Pipe
    GM2815534Courtesy of GENERAL MOTORS COMPANY
  14. Install the PCV pipe (1). Refer to Positive Crankcase Ventilation Hose/Pipe/Tube Replacement (Camshaft Cover to Air Cleaner Resonator to Outlet Duct) , Positive Crankcase Ventilation Hose/Pipe/Tube Replacement (LKW) .
  15. Install the intake manifold cover. Refer to Intake Manifold Cover Replacement (LKW) .