LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2013 >> Sonic RS, Standard Trans >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 1 (Engine Mechanical - 1.8L (LUW, LWE)) >> Repair Instructions - Off Vehicle >> Secondary Air Injection Check Valve Installation

Secondary Air Injection Check Valve Installation

WARNING: This page is about a different variant/trim than selected.
    Fig 1: Secondary Air Injection Check Valve Bolts
    GM2781590Courtesy of GENERAL MOTORS COMPANY
  1. Install a NEW secondary air injection check valve gasket (1).
  2. Install the secondary air injection check valve (2).
  3. CAUTION:

    Refer to Fastener Caution .

  4. Install the 3 secondary air injection check valve bolts (3) and tighten to 22 N.m (16 lb ft).