LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2012 >> Express 1500 AWD V8-5.3L >> Repair and Diagnosis >> Transmission and Drivetrain >> Automatic Transmission/Transaxle >> Service and Repair >> Overhaul >> 4L60-E/4L65-E/4L70-E - Automatic Transmission >> 58. 2-4 Band Installation

58. 2-4 Band Installation




2-4 Band Installation





1. Inspect the 2-4 band assembly (602) for damage or wear.

2. Install the 2-4 band (602) into the case.





3. Install the band anchor pin (41) into the case.

4. Index the band to fit the band anchor pin into the band.