Installation Procedure
WARNING: This page is about a different variant/trim than selected.
- Clean the sealing surfaces.
- Install the rubber bracket (2) to intake manifold (1).
- Install the manifold absolute pressure sensor (2) to the intake manifold (3).
- Install the manifold absolute pressure sensor bolt (1) and tighten to 6 N.m (53 lb in).
- Install the NEW gaskets (1, 3) to the intake manifold (2).
- Install the intake manifold (2) and the 7 intake manifold bolts (1) and tighten to 20 N.m (15 lb ft).
- Connect the booster vacuum pipe (1) to the intake manifold.
- Install the 4 multiport fuel injector seals (4).
- Install the multiport fuel injection fuel rail (2) and the fuel injectors (3) to the intake manifold (5).
- Install the 2 multiport fuel injection fuel rail bolts (1) and tighten to 8 N.m (71 lb in).
- Connect the throttle body heater outlet hose (4) to the throttle body (3).
- Install the throttle body heater inlet hose (1) to the throttle body (3) and install the clamp (2).
- Connect the manifold absolute pressure sensor wiring harness plug (5).
- Install the engine management wiring harness and the fuel injectors wiring harness.
- Install the positive crankcase ventilation tube (1) the to throttle body (3) and to the camshaft cover (2).
- Install the throttle body assembly. Refer to Throttle Body Assembly Replacement .
- Install the evaporative emission canister purge solenoid valve. Refer to Evaporative Emission Canister Purge Solenoid Valve Replacement
- Remove the cap from fuel feed pipe (2).
- Install the fuel feed pipe (2) to the multiport fuel injection fuel rail (1).
- Clip the fuel feed pipe (2) to the fuel feed pipe clip (3).
- Install the intake manifold brace (1).
- Install and connect the wiring harness plug to the heated oxygen sensor 1.
- Install the 2 intake manifold brace bolts (2, 3) and tighten to 8 N.m (71 lb in).
- Lower the vehicle.
- Install the air cleaner outlet duct. Refer to Air Cleaner Outlet Duct Replacement .
- Close the hood.
CAUTION:
Refer to Fastener Caution .