LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2012 >> Cruze Eco, Automatic Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 77 (Instrument Panel System Displays & Gauges) >> Diagnostic Information and Procedures >> Boost Gauge Malfunction >> Circuit/System Testing

Circuit/System Testing

WARNING: This page is about a different car, the 2010 Pontiac G5 and 2010 Chevrolet Cobalt. However, it is still accessible from the selected car via links, so may be relevant.
  1. Ignition OFF, disconnect the harness connector at the boost gauge.
  2. Ignition OFF, test for less than 5 ohms between the ground circuit terminal D and ground.
    • If greater than the specified range, test the ground circuit for an open/high resistance.
  3. Ignition ON, verify a test lamp illuminates when connected between the B+ voltage circuit terminal A and ground.
    • If the test lamp does not illuminate, test the B+ circuit for a short to ground or an open/high resistance. If the circuit tests normal, test or replace the BCM.
  4. Ignition OFF, connect the harness connector at the boost gauge.
  5. Ignition ON, verify that the boost gauge performs a self test by the gauge dial moving up to the 0 kPa (0 psi) mark.
    • If the boost gauge does not perform a self test, test the boost gauge signal circuit terminal C for a short to ground or an open/high resistance. If the circuit tests normal, replace the PCM.
  6. If all circuits test normal, replace the boost gauge.