LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2012 >> Cruze Eco, Automatic Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 144 (Engine Mechanical - 2.2L) >> Repair Instructions - Off Vehicle >> Piston, Connecting Rod, and Bearing Installation (LAP, LE8) >> Special Tools

Special Tools

WARNING: This page is about a different car, the 2010 Pontiac G5 and 2010 Chevrolet Cobalt. However, it is still accessible from the selected car via links, so may be relevant.

For equivalent regional tools, refer to Special Tools .

    Fig 1: J-43966-1 Installed Into Connecting Rod Bolt Holes
    GM412431Courtesy of GENERAL MOTORS CORP.
  1. Install the connecting rod bearings. Use the proper size bearings.
    1. Install the bearing inserts into the connecting rod and the connecting rod cap.
    2. Lubricate the connecting rod bearings with engine oil.
  2. Install the J-43966-1:  guide / J 41742:  guide into the connecting rod bolt holes. This protects the crankshaft journal during piston and connecting rod installation.
  3. Install the piston and the connecting rod to the correct bore.
    1. Stagger each piston ring end gap equally around the piston.
    2. Lubricate the piston and the piston rings with engine oil.
    3. Install J 43953:  piston over the piston. Do not disturb the piston ring end gap location.
    4. The piston must be installed so that the mark on the top of the piston faces the front of the engine.
    5. Place the piston in its matching bore.
    6. Tap the piston into its bore with a hammer handle. Guide the connecting rod to the connecting rod journal while tapping the piston into place.
    7. Hold the J 43953:  piston against the engine block until all the rings have entered the cylinder bore.
    8. Remove the connecting rod guides from the connecting rod bolt holes.
  4. Fig 2: View Of Connecting Rod Nuts And Caps
    GM412430Courtesy of GENERAL MOTORS CORP.
    NOTE: Ensure that the connecting rod cap is properly oriented on the connecting rod.
  5. Install the connecting rod cap.
  6. CAUTION: Refer to Fastener Caution .
  7. Install the connecting rod bolts. Always use new bolts. Tighten the connecting rod bolt nuts to 25 N.m (18 lb ft), plus 100 degrees using J 45059:  meter
  8. Install the remaining connecting rods and piston assemblies.
  9. Fig 3: Measuring Connecting Rod Side Clearance
    GM465919Courtesy of GENERAL MOTORS CORP.
  10. Measure the connecting rod side clearance with a feeler gauge.

    The correct clearance is 0.070-0.370 mm (0.0027-0.0145 in).