LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2012 >> Cruze Eco, Automatic Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 139 (Engine Controls And Fuel - 2.2L - DTC P0351 To DTC P2544) >> DTC P0685 or P0690 >> Component Testing

Component Testing

WARNING: This page is about a different car, the 2010 Pontiac G5 and 2010 Chevrolet Cobalt. However, it is still accessible from the selected car via links, so may be relevant.
    NOTE: Depending on the application, the relay coil resistance will be within one of the following ranges.
  1. Test for one of the following resistance specifications between terminals 85 and 86 of the KR75 powertrain relay:
    • 70-110 Ω
    • 200-250 Ω
    • If not within the specified range, replace the KR75 powertrain relay.
  2. Test for infinite resistance between the following terminals of the KR75 powertrain relay:
    • 30 and 86
    • 30 and 87
    • 30 and 85
    • 85 and 87
    • If not the specified value, replace the KR75 powertrain relay.
  3. Install a 20 A fused jumper wire between relay terminal 85 and 12 V. Install a jumper wire between relay terminal 86 and ground. Test for less than 2 Ω between terminals 30 and 87.
    • If greater than the specified range, replace the KR75 powertrain relay.