LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2012 >> Cruze Eco, Automatic Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 127 (Engine Controls And Fuel - 2.2L - Troubleshooting And Diagnosis) >> Inspection/Maintenance Complete System Set Procedure >> Description >> Notes

Inspection/Maintenance Complete System Set Procedure: Description: Notes

WARNING: This page is about a different car, the 2010 Pontiac G5 and 2010 Chevrolet Cobalt. However, it is still accessible from the selected car via links, so may be relevant.

The purpose of the Inspection/Maintenance Complete System Set Procedure is to satisfy the enable criteria necessary to execute all of the I/M readiness diagnostics and complete the drive cycles for those particular diagnostics. When all I/M monitored diagnostic tests are completed, the I/M System Status indicators are set to YES. Perform the Inspection/Maintenance Complete System Set Procedure if any I/M System Status indicators are set to NO.