Installation Procedure
WARNING: This page is about a different car, the 2011 GMC Yukon, 2011 Chevrolet Tahoe, and 2011 Cadillac Escalade. However, it is still accessible from the selected car via links, so may be relevant.
NOTE:
- All gasket surfaces should be free of oil or other foreign material during assembly.
- DO NOT reuse the valve rocker arm cover gasket.
- If the oil fill tube has been removed from the rocker arm cover, install a NEW fill tube during assembly.
- Lubricate the O-ring seal (422) of the NEW oil fill tube with clean engine oil.
- Insert the NEW oil fill tube (423) into the rocker arm cover.
Rotate the tube clockwise until locked in the proper position.
- Install the oil fill cap (424) into the tube.
Rotate the cap clockwise until locked in the proper position.
- Install a NEW rocker cover gasket (1) into the valve rocker arm cover lip.
- Install the valve rocker arm cover.
- Tighten the rocker arm cover bolts.
Tighten
Tighten the bolts to 12 N.m (106 lb in).
- Install the PCV tube (1) to the valve rocker cover (2).
- Apply threadlock GM P/N 12345382 (Canadian P/N 10953489), or equivalent to the threads of the ignition coil bracket studs.
- Position the ignition coil bracket (719) onto the rocker cover.
- Install the ignition coil bracket studs (720).
Tighten
Tighten the studs to 12 N.m (106 lb in).
- Install the spark plug wires (724) to the ignition coils.
- Install the heater hose bracket (2) and nut (1).
Tighten
Tighten the nut to 9 N.m (80 lb in).
- Install the surge tank outlet hose (2) to the heater hose bracket (3).
- Install the heater inlet hose (2) to the heater hose bracket (3).
- Position the generator battery cable as necessary.
- Install the generator battery cable clip (1) to the ignition coil bracket stud.
- Position the engine wiring harness (electronic throttle control branch) as necessary.
- Install the engine wiring harness (electronic throttle control branch) clip to the ignition coil bracket stud.
- Connect the engine harness electrical connector (1) to the ignition coil wire harness.
- Install the CPA retainer (2).
- Position the generator control module 3 phase cables to the bracket channel.
- Install the generator control module 3 phase cable clip to the tab (3) on the engine bracket (2).
- Install the generator control module 3 phase cable clip nut (1).
Tighten
Tighten the nut to 9 N.m (80 lb in).
- Enable the high voltage system. Refer to High Voltage Enabling .
- Install the intake manifold cover. Refer to Upper Intake Manifold Sight Shield Replacement .
CAUTION:
Refer to Fastener Caution .