2-3 Shift Valve (357)
WARNING: This page is about a different variant/trim than selected.
In PARK range, line pressure passes through the 2-3 shift valve (357) and line pressure feeds the input clutch feed passage. Line pressure then passes through the 3-4 shift valve (362) and around the #3 ball check valve (372), located in the case cover) in order to apply the input clutch. Although the input clutch is applied and the input sprag is holding, these conditions are not effective because neither the forward band assembly (688) nor the reverse band assembly (615) is applied.