LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2009 >> TrailBlazer 2WD L6-4.2L >> Repair and Diagnosis >> Engine, Cooling and Exhaust >> Engine >> Service and Repair >> Overhaul >> Repair Instructions >> 78. Oil Pump Suction Pipe and Screen Assembly Installation

78. Oil Pump Suction Pipe and Screen Assembly Installation




Oil Pump Suction Pipe and Screen Assembly Installation




1. Install a new oil pump pipe gasket.
2. Install the oil pump pipe and screen assembly.
3. Add sealant GM P/N 12346004 (Canadian P/N 10953480) to the oil pump pipe bolt threads.

Caution: Refer to Fastener Caution (Fastener Caution).

4. Install the oil pump pipe and screen assembly bolts. Tighten the oil pump pipe and screen assembly bolts to 10 Nm (89 lb in).