LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2007 >> Optra LS, Automatic >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Displays And Gages >> Repair Instructions >> Clock Replacement (Four Door) >> Installation Procedure

Installation Procedure

    Fig 1: View Of Clock Screws
    GM1308551Courtesy of GENERAL MOTORS CORP.
    NOTE: Refer to Fastener Notice .
  1. Install the digital clock with the screws.
  2. Connect the electrical connector.
  3. Install the Instrument panel center molding. Refer to Instrument Panel Center Trim Panel Replacement (Five Door/Wagon) or Instrument Panel Center Trim Panel Replacement (Four Door) .
  4. Connect the negative battery cable.