LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2007 >> Chevy Express G2500, Van Cargo, 6.6 6 >> Repair and Diagnosis >> Transmission >> Hydraulic Diagrams >> Automatic Transmission - 4L80-E/4L85-E - Removal & Installation, Service, Overhaul, Troubleshooting & Diagnosis >> Off-Vehicle Repair Instructions >> Torque Converter End Play Inspection

Torque Converter End Play Inspection

Tools Required

    Fig 1: Installing J 39195 Onto Torque Converter Assembly
    GM28372Courtesy of GENERAL MOTORS CORP.
  1. Place the J 39195  base into the torque converter assembly (1). The J 39195  will bottom itself on the face of the stator.
  2. Insert the T-handle forcing screw of the J 39195  into the base and hand tighten.
  3. Using the J 26900-13  , position the J 8001  so that the dial indicator tip is in the center of the J 39195  T-handle.
  4. Push down on the J 39195  T-handle to bottom the stator.
  5. Preload the J 8001  .
  6. Set the J 8001-3  to 0.
  7. Pull up on the J 39195  T-handle.
  8. Inspect the reading on the dial indicator. The total end play should be 0.0-0.38 mm (0.0-0.015 in).
  9. Repeat this procedure several times in order to get an accurate measurement.
  10. Remove the tools.