LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2007 >> Chevy Express G2500, Van Cargo, 6.6 6 >> Repair and Diagnosis >> Transmission >> Hydraulic Diagrams >> Automatic Transmission - 4L80-E/4L85-E - Removal & Installation, Service, Overhaul, Troubleshooting & Diagnosis >> Off-Vehicle Repair Instructions >> Overdrive Carrier Assemble

Overdrive Carrier Assemble

    Fig 1: View Of Overdrive Clutch Roller Assembly
    GM774707Courtesy of GENERAL MOTORS CORP.
  1. Install the overdrive clutch roller assembly (512) on the overrun clutch housing assembly (504).
  2. IMPORTANT: Rotate the overdrive carrier assembly (514) during installation in order to line up the overdrive clutch plates with the overdrive carrier assembly splines.
  3. Install the overdrive carrier assembly (514) on the overrun clutch housing assembly (504).
  4. Fig 2: View Of Overdrive Carrier Retainer Ring And Turbine Shaft
    GM31185Courtesy of GENERAL MOTORS CORP.
    NOTE: Align the components carefully to avoid damaging the turbine shaft oil seal rings.
  5. Install the turbine shaft (502) through the overrun clutch housing assembly (504) and the overdrive carrier assembly (514).
  6. Install the overdrive carrier retainer ring (522).