LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2007 >> Chevy Express G2500, Van Cargo, 6.6 6 >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 21 (Automatic Transmission - 4L60-E/4L65-E/4L70-E - Removal & Installation, Service, Overhaul, Troubleshooting & Diagnosis) >> On-Vehicle Repair Instructions >> Transmission Fluid Auxiliary Cooler Replacement >> Installation Procedure

Installation Procedure

WARNING: This page is about a different variant/trim than selected.
    Fig 1: Auxiliary Oil Cooler & Mounting Bolts
    GM102294Courtesy of GENERAL MOTORS CORP.
    NOTE: Refer to FASTENER NOTICE .
  1. Install the 4 bolts securing the oil cooler to the radiator support.

    Tighten:  Tighten the bolts to 10 N.m (89 lb in).

  2. Install the oil cooler lines to the auxiliary oil cooler. Refer to Transmission Fluid Cooler Hose/Pipe Replacement .

    Tighten:  Tighten the cooler lines to 23 N.m (17 lb ft).

  3. Remove the drain pan.
  4. Install the grille assembly. Refer to Grille Replacement (Base) or Grille Replacement (Uplevel) .