Installation Procedure
- Install the shift lever (1).
- Connect the shifter electrical connector.
- Install the wire straps to the harness.
- Install the harness retaining pin (4) to the instrument panel.
- Install the knee bolster deflector bracket and nuts (1).
Tighten: Tighten the nuts to 9 N.m (80 lb in).
- Install the knee bolster. Refer to Knee Bolster Replacement in Instrument Panel, Gages and Console.
- Install the TORX® head shift lever screw.
Tighten: Tighten the screw to 20 N.m (15 lb ft).
- Roll the seal over the TORX® head shift lever screw.
- Install the 2 TORX® head screws to the lower column trim cover.
- Install the trim covers. Refer to Steering Column Trim Covers Replacement .
NOTE:
Refer to Fastener Notice
in Cautions and Notices.