Installation Procedure
- Install the I/P extension (1) to the I/P.
- Install the screws (3).
Tighten: Tighten the screws (3) to 3 N.m (26 lb in).
- Install the nuts (2) that retain the HVAC duct to the I/P extension.
Tighten: Tighten the screws (2) to 3 N.m (26 lb in).
- Install the I/P upper trim pad. Refer to Trim Pad Replacement - Instrument Panel (I/P) Upper .
- Install the knee bolster trim panel. Refer to Knee Bolster Replacement - Right .
- Enable the SIR. Refer to SIR Disabling and Enabling Zone 5 in SIR.
NOTE:
Refer to Fastener Notice
in Cautions and Notices.