1st-2nd Gear Shift Shaft Assembly
WARNING: This page is about a different car, the 2008 Pontiac Wave. However, it is still accessible from the selected car via links, so may be relevant.
- Place the shift shaft into a vise with protector.
- Install the 1st-2nd gear shift yoke.
- Install the 1st-2nd gear shift yoke pin using a pin (1) punch and a hammer.
- Install the 1st-2nd gear shift fork.
- Install the 1st-2nd gear fork pin (4) using a pin punch and a hammer.
- Install the each shift shaft assembly into the gear unit.
- Install the gear unit. Refer to Transmission Assemble .