Installation Procedure
- Connect the electrical connectors.
- Position the IP cluster to the instrument panel.
- Install the screws to instrument panel cluster.
Tighten: Tighten the screws to 2.5 N.m (22 lb in).
- Install the instrument cluster trim plate. Refer to Trim Panel Replacement - Instrument Panel (I/P) Cluster .
When installing a new IP cluster it must be synchronized to the supplemental inflatable restraint (SIR) module in order to synchronize the new cluster. Refer to Instrument Panel Cluster (IPC) Programming/Synchronization and to Electronic Compass Calibration .
NOTE:
Refer to Fastener Notice in Cautions and Notices.