Installation Procedure
- Connect the electrical connector to the instrument cluster.
- Install the instrument cluster to the I/P.
- Install the instrument cluster screws.
Tighten: Tighten the instrument cluster screws to 2 N.m (18 lb in).
- Install the I/P cluster trim plate. Refer to Trim Plate Bezel Replacement - Instrument Panel (I/P) Cluster (Impala) or Trim Plate Bezel Replacement - Instrument Panel (I/P) Cluster (Monte Carlo) .
- If a new instrument cluster was installed, program the cluster. Refer to Service Programming System (SPS) in Vehicle Control Systems.
NOTE:
Refer to Fastener Notice in Cautions and Notices.