Installation Procedure
- Install the speedometer with the screws.
Tighten: Tighten the speedometer screws to 2 N.m (18 lb in) .
- Install the instrument cluster case with the screws.
- Install the instrument cluster lens.
- Install the instrument cluster. Refer to Instrument Panel Cluster (IPC) Replacement .
- Connect the negative battery cable.
NOTE:
Refer to Fastener Notice
in Cautions and Notices.