Installation Procedure
- Install the striker (3) to the I/P carrier (1).
- Install the screws (2) to the striker (3).NOTE: Refer to FASTENER NOTICE in Cautions and Notices.
- Adjust the striker (3) for proper alignment to the I/P compartment.
Tighten
Tighten the screws to 2.3 N.m (20 lb in).
- Install the I/P trim pad. Refer to TRIM PAD REPLACEMENT - INSTRUMENT PANEL (I/P) (CHEVROLET) or TRIM PAD REPLACEMENT - INSTRUMENT PANEL (I/P) (PONTIAC) .