LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2002 >> TrailBlazer RWD >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Instrument Panel, Gauges & Console >> Repair Instructions >> Closeout/Insulator Panel Replacement - Left >> Installation Procedure

Installation Procedure

  1. Position the insulator panel to the IP.
  2. Install the hazard and turn signal flasher to the insulator panel. Refer to HAZARD AND TURN SIGNAL FLASHER REPLACEMENT in Lighting Systems.
  3. Install the splice pack to the insulator panel.
  4. Install the courtesy lamp to the insulator panel. Refer to COURTESY LAMP REPLACEMENT - INSTRUMENT PANEL in Lighting Systems.
  5. Position the DLC to the insulator panel.
    Fig 1: View Of Data Link Connector (DLC) & Retaining Screws
    GM763321Courtesy of GENERAL MOTORS CORP.
    NOTE: Refer to FASTENER NOTICE in Cautions and Notices.
  6. Install the DLC retaining screws.

    Tighten:  Tighten the DLC retaining screws to 2.5 N.m (22 lb in).

  7. Install the insulator panel tabs to the cowl slots.
    Fig 2: Removing/Installing Insulator Panel Tabs To Cowl Slots
    GM712807Courtesy of GENERAL MOTORS CORP.
  8. Raise the insulator panel to the IP.
  9. Install the insulator panel retaining clip to the IP substrate.
  10. Install the 2 screws that retain the insulator panel to the IP.

    Tighten:  Tighten the screws to 2.5 N.m (22 lb in).

    Fig 3: Removing/Installing Closeout/Insulator Panel & Retaining Screws
    GM712800Courtesy of GENERAL MOTORS CORP.