Installation Procedure
- If removed, install the throttle body.
- Install the upper intake manifold gasket.
- Install the upper intake manifold.
- Install the left upper intake manifold bolts.
- Install the right upper intake manifold bolts and the studs. Tighten the bolts and the studs to 25 N.m (18 ft lbs).
- Install the exhaust gas recirculation (EGR) valve.
- Install the manifold absolute pressure (MAP) sensor bracket and the sensor.
- Install the EVAP canister purge valve.
- Install the ignition coil bracket with the coils.
- Install the thermostat bypass pipe coolant hoses (3,4) to the throttle body.
- Install the following wiring harnesses to the retainers:
- Engine wiring harness
- Left side spark plug wire harness
- Camshaft position (CMP) sensor wiring harness
- Install the left side spark plug wires to the spark plugs.
- Install the accelerator control and cruise control cables with bracket to the throttle body.
- Install the air cleaner intake duct.
- Connect the electrical connectors to the following:
- Evaporative emission (EVAP) canister purge valve
- Throttle position (T/P) sensor
- Idle air control (IAC) valve
- Intake air temperature (IAT) sensor
- Mass air flow (MAF) sensor
- Exhaust gas recirculation (EGR) valve
- Install the vacuum hoses to the following:
- Heater and air conditioning source
- Brake booster
- Manifold vacuum source
- Evaporative emissions (EVAP) canister purge valve
- Fuel pressure regulator
- Connect the negative battery cable.
- Fill the cooling system.