LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2002 >> Blazer 4D Utility, 4WD, Part Time >> Repair and Diagnosis >> External Pages >> Different car >> Section 981 (Battery, Charging System & Starting System) >> Repair Instructions >> Energy Storage Box (ESB) Service Disconnect Switch Replacement (5.3L Engine w/RPO HP2) >> Installation Procedure

Installation Procedure

WARNING: This page is about a different car, the 2004 GMC Sierra, 2004 GMC Cab & Chassis Sierra, 2004 Chevrolet Silverado, and 2004 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
  1. Install the service disconnect switch.
  2. Fig 1: View Of Service Disconnect Switch (5.3L Engine w/RPO HP2)
    GM1403637Courtesy of GENERAL MOTORS CORP.
    NOTE: Refer to Fastener Notice in Cautions and Notices.
  3. Remove the service disconnect power cable nut and cable (2) from the service disconnect switch.

    Install the service disconnect switch nuts.

    Tighten:  Tighten the nuts to 6 N.m (53 lb in).

  4. Fig 2: View Of Service Disconnect Switch Nuts (5.3L Engine w/RPO HP2)
    GM1456045Courtesy of GENERAL MOTORS CORP.
  5. Install the service disconnect switch screws.

    Tighten:  Tighten the screws to 6 N.m (53 lb in).

  6. Fig 3: View Of Service Disconnect Switch Screws (5.3L Engine w/RPO HP2)
    GM1403636Courtesy of GENERAL MOTORS CORP.
  7. Install the service disconnect power cable and nut to the service disconnect switch.

    Tighten:  Tighten the nut to 10 N.m (89 lb in).

  8. Fig 4: View Of Service Disconnect Switch Power Cable & Nut (5.3L Engine w/RPO HP2)
    GM1403629Courtesy of GENERAL MOTORS CORP.
  9. Install the service disconnect power cable (2) and nut (2) to the service disconnect switch.

    Tighten:  Tighten the screws to 10 N.m (89 lb in).

  10. Fig 5: View Of Service Disconnect Power Cable & Nut (5.3L Engine w/RPO HP2)
    GM1403628Courtesy of GENERAL MOTORS CORP.
  11. Install the ESB intermediate cover. Refer to Energy Storage Box (ESB) Intermediate Cover Replacement (5.3L Engine w/RPO HP2) .