LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2002 >> Blazer 4D Utility, 4WD, Part Time >> Repair and Diagnosis >> External Pages >> Different car >> Section 981 (Battery, Charging System & Starting System) >> Repair Instructions >> Energy Storage Box (ESB) Power Cable Replacement - Battery 2 to Battery 3 (5.3L Engine w/RPO HP2) >> Removal Procedure

Removal Procedure

WARNING: This page is about a different car, the 2004 GMC Sierra, 2004 GMC Cab & Chassis Sierra, 2004 Chevrolet Silverado, and 2004 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
  1. Remove the energy storage box (ESB) intermediate cover. Refer to Energy Storage Box (ESB) Trim Cover Replacement (5.3L Engine w/RPO HP2) .
  2. Cut the tie straps (1) securing the power cable to the ESB.
  3. Remove the power cable nuts (3) from battery 2 and battery 3.
  4. Remove the power cable (2) from battery 2 and battery 3.
  5. Fig 1: View Of ESB Power Cable, Tie Straps & Nuts (Battery 2 To Battery 3) (5.3L Engine w/RPO HP2)
    GM1338110Courtesy of GENERAL MOTORS CORP.