Installation Procedure
WARNING: This page is about a different car, the 2004 GMC Sierra, 2004 GMC Cab & Chassis Sierra, 2004 Chevrolet Silverado, and 2004 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
- Install the fuse power cable (2) to the fuse holder and high current sensor.
- Install NEW tie straps (4) securing the fuse power cable to the ESB.
- Install the fuse power cable nut (3) at the high current sensor.
Tighten: Tighten the nut to 10 N.m (89 lb in).
- Install the maxi-fuse. Refer to Energy Storage Box (ESB) Maxi-Fuse Replacement (5.3L Engine w/RPO HP2) .
NOTE:
Refer to Fastener Notice
in Cautions and Notices.