Removal Procedure
WARNING: This page is about a different car, the 2004 GMC Sierra, 2004 GMC Cab & Chassis Sierra, 2004 Chevrolet Silverado, and 2004 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
- Disconnect the 120-volt AC electrical connector (3).
- Remove the energy storage box (ESB) intermediate cover. Refer to Energy Storage Box (ESB) Trim Cover Replacement (5.3L Engine w/RPO HP2) .
- Remove the receptacle outlet cover screws (1).
- Remove the 120-volt cable connector screws.
- Disconnect the retainers securing the 120-volt cable to the ESB.
- Note the routing of the 120-volt cable.
- Remove the 120-volt cable (1) out through the receptacle opening (2) in the ESB.
Fig 1: View Of 42-Volt Positive/Negative Cable Electrical Connector, AC Electrical Connector, Ground Strap & Stud