Installation Procedure
WARNING: This page is about a different car, the 2004 GMC Sierra, 2004 GMC Cab & Chassis Sierra, 2004 Chevrolet Silverado, and 2004 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
- Install fuel injector feed pipes.
- Tighten the fuel injector feed pipe fittings (1, 2).
Tighten: Tighten the fittings to 41 N.m (30 lb ft).
- Install the fuel injector feed pipe retainers and bolts.
Tighten: Tighten the screws to 4 N.m (35 lb in).
- After installing the fuel injector lines, clean the injector line and apply sealant, GM P/N 97720043, at the fittings (1, 2) to prevent moisture and debris from collecting between the line and fitting
- Install the PCV hose to the upper valve rocker arm cover.
- Position the PCV hose clamp.
- Install the engine wiring harness bracket bolts (2).
Tighten: Tighten the bolts to 10 N.m (89 lb in).
- Install the engine wiring harness bulk electrical connector bolts (1).
Tighten: Tighten the bolts to 21 N.m (15 lb ft).
- Connect the engine wiring harness bulk electrical connectors.
- Install the water outlet tube. Refer to Water Outlet Tube Replacement (6.6L (LB7) Engine) or Water Outlet Tube Replacement (6.6L (LLY) Engine) in Engine Cooling.
- Install the glow plug relay bracket. Refer to Glow Plug Relay Replacement (Federal Emissions) or Glow Plug Relay Replacement (California Emissions) .
- Install the auxiliary generator, if equipped. Refer to Generator Replacement - Auxiliary (6.6L (LB7) Engine) or Generator Replacement - Auxiliary (6.6L (LLY) Engine) in Engine Electrical.
- Connect the fuel lines to the chassis pipes. Refer to Quick Connect Fitting(s) Service (Metal Collar) .
- Install the fuel hose bracket nut to the valve rocker arm cover.
Tighten: Tighten the nut to 21 N.m (15 lb ft).
- Position the generator positive cable.
- Install the generator positive cable in the clip on the engine front cover.
- Install the generator positive cable and nut to the generator.
Tighten: Tighten the nut to 9 N.m (80 lb in).
- Install the battery positive cable junction block bracket and bolt to the power steering pump.
Tighten: Tighten the bolt to 9 N.m (80 lb in).
- Install the charged air cooler inlet duct to the turbocharger.
- Align the mark on the duct (2) with the mark on the turbocharger.
- Position the clamp (1) as shown for proper clearance.
Tighten: Tighten the clamp to 6 N.m (53 lb in).
- Connect the negative battery cable. Refer to Battery Negative Cable Disconnect/Connect Procedure (Single Battery) or Battery Negative Cable Disconnect/Connect Procedure (Auxiliary Battery) in Engine Electrical.
- Fill the cooling system. Refer to Draining and Filling Cooling System (with HP2) or Draining and Filling Cooling System (without HP2) in Engine Cooling.
- Install the upper intake manifold cover.
- Install the upper intake manifold cover to the outlet duct.
- Tighten the outlet duct clamp at the upper intake manifold cover.
Tighten: Tighten the clamp to 6 N.m (53 lb in).
NOTE:
Ensure proper torquing of the fuel injector line. An under-torqued fuel injector line will not seal properly and an over-torqued fuel injector line may damage the fuel injector fitting. An improperly sealed or damaged fuel injector line or fuel injector fitting will cause a fuel leak.
NOTE:
Refer to Fastener Notice in Cautions and Notices.