LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2002 >> Blazer 4D Utility, 4WD, Part Time >> Repair and Diagnosis >> External Pages >> Different car >> Section 933 (Exterior Trim) >> Repair Instructions >> Molding Replacement -Roof Joint >> Tools Required >> Installation Procedure

Installation Procedure

WARNING: This page is about a different car, the 2003 GMC Sonoma, 2003 GMC Jimmy, 2003 Chevrolet S10 Pickup, and 2003 Chevrolet Blazer. However, it is still accessible from the selected car via links, so may be relevant.
  1. Use the J 25070  in order to heat the cab in the joint area. Preheat the sheet metal to approximately 93°C (200°F).
  2. Install the molding.

    Preheat the sheet metal in order to melt the sealer and bond the molding into the joint. Sealer begins to flow at approximately 93°C (200°F).

    Fig 1: Roof Joint Molding
    G01477393Courtesy of GENERAL MOTORS CORP.