Installation Procedure
WARNING: This page is about a different car, the 2002 GMC Sierra, 2002 GMC Cab & Chassis Sierra, 2002 Chevrolet Silverado, and 2002 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
- Install the engine electrical center bracket assembly to the front fender.
- Install the 4 retaining bolts (1). Tighten the 4 retaining bolts (1) to 9 N.m (80 in lbs).
- Align the electrical center block (1) stubs in the slots so that the tabs (2) retains it in place.
- Connect the wire connectors to the lower portion of the electrical center block.
- Connect the wire connectors with the bolts to the electrical center block. Tighten all connector bolts (1) to 9 N.m (80 in lbs).
- Ensure all wire connectors are securely connected.
- Set the electrical center block in its resting position till the tabs (3) locks in place.
- Install the lower part of the cover (1).
- With the cover (2) off, use the fuse location information to install all fuses and relays.
- Install the cover.
- Install the fender upper brace.
- Install the 4 fender upper brace bolts. Tighten the 4 retaining bolts to 25 N.m (18 ft lbs).
- Connect the negative battery cable.
- Start vehicle and ensure all components function properly.