LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2002 >> Blazer 4D Utility, 4WD, Part Time >> Repair and Diagnosis >> External Pages >> Different car >> Section 608 (Exterior Trim) >> Repair Instructions >> Molding Replacement - Rear Quarter (Luxury Y91) >> Installation Procedure

Installation Procedure

WARNING: This page is about a different car, the 2002 GMC Savana Special, 2002 GMC Savana Camper Special, 2002 GMC Savana, and 2002 Chevrolet Chevy Express. However, it is still accessible from the selected car via links, so may be relevant.

Important:  The body side moldings are attached to the body panels with adhesive tape at the upper edge. In order to ensure a good replacement of moldings, the quarter panel surface should meet the following conditions:

  1. Wash the rear quarter panel with soap, and with water. Dry the surface with a towel. Wipe the rear quarter panel with a clean rag. Use naphtha. Allow the surface to air-dry.
  2. Heat the upper edge of the rear quarter panel to 21-32°C (70-90°F).
    • Keep the J 25070  at a distance of 152 mm (6 in) from the surface.
    • Use the J 25070  in a circular motion for 30 seconds.
  3. Remove the protective liner from the back side of the rear quarter panel molding.
  4. Position the rear quarter panel molding to the rear quarter panel.
  5. Carefully install the upper edge of the rear quarter panel molding. Apply pressure to the entire length of the molding. Starting at the rear of the vehicle, move toward the front of the vehicle, consistently applying pressure to the molding. This process will ensure a maximum bond to the rear quarter panel.
    CAUTION: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.
  6. Install the bolt to the bottom of the rear quarter panel.

    Tighten 

    Tighten the bolt to 3 N.m (27 in lbs).

  7. Install the push-in-retainers to the inside rear edge of the rear quarter panel molding.
    Fig 1: Installing Bolt & Push-In-Retainers
    G01736732Courtesy of GENERAL MOTORS CORP.