LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2002 >> Blazer 4D Utility, 4WD, Part Time >> Repair and Diagnosis >> External Pages >> Different car >> Section 49 (Disc Brakes) >> Removal & Installation >> Brake Pipe

Brake Pipe

WARNING: This page is about a different car, the 2002 Oldsmobile Aurora. However, it is still accessible from the selected car via links, so may be relevant.
NOTE: Required Tools: ISO Flaring Kit (J-29803-A).
CAUTION: Always use double walled steel brake pipe when replacing brake pipes. The use of any other pipe is not recommended and may cause brake system failure. Carefully route and retain replacement brake pipes. Always use the correct fasteners and the original location for replacement brake pipes. Failure to properly route and retain brake pipes may cause damage to the brake pipes and cause brake system failure.
  1. Obtain the correct size pipe and the correct size steel fitting nuts. Use the outside diameter of the pipe in order to specify the size. Cut the pipe square and to the correct length using a hack saw. Measure the old pipe using a string and add 0.125 in (3.2 mm) for each ISO flare. Install the fittings before starting the flare.
  2. Chamfer the inside and the outside diameter of the pipe using a de-burring tool. Remove all traces of lubricant from the brake pipe and the ISO Flaring Kit. Clamp the ISO Flaring Kit in a vise. Select the correct size collet and forming mandrel for the pipe size used.
  3. Insert the properly formed mandrel into the ISO Flaring Kit. Hold the forming mandrel in place using your finger. Thread in the forcing screw until contact is made and the screw begins to move the forming mandrel. Turn the forcing screw back one complete turn. Slide the clamping nut over the brake pipe.
  4. Insert the prepared brake pipe into the correct collet. Leave approximately 0.750 in (19 mm) of tubing extending out of the collet. Insert the assembly into the ISO Flaring Kit. Ensure that the brake pipe end contacts the face of the forming mandrel. Tighten the clamping nut into the ISO Flaring Kit body tightly in order to ensure that the pipe will not push out.
  5. NOTE: DO NOT over tighten the forcing screw or the flare may become oversized.
  6. Wrench tighten the forcing screw until the screw bottoms. Back the clamping nut out of the ISO Flaring Kit. Disassemble the clamping nut and the collet assembly. Measure the flare diameter. It should fall between specifications. See FLARING KIT DIAMETER  table.
    FLARING KIT DIAMETER

    Application In. (mm)
    Measured Diameter 0.272-0.286 (6.92-7.28)
  7. Use a tube bender in order to bend the new pipe to match the old pipe. Maintain the following clearances: Maintain the minimum clearance of 0.75 in (19 mm) to all moving components. Maintain the minimum clearance of 0.50 in (13 mm) to all vibrating components. Maintain the minimum clearance of 0.25 in (7 mm) to any shielded lines, unless clipped to a component.