LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2002 >> Blazer 4D Utility, 4WD, Part Time >> Repair and Diagnosis >> External Pages >> Different car >> Section 1992 (Automatic Transmission - 2MT70 - DTC P0218 To DTC P0963) >> DTC P0721-P0723 >> Circuit/System Testing

Circuit/System Testing

WARNING: This page is about a different car, the 2009 Saturn Vue. However, it is still accessible from the selected car via links, so may be relevant.
  1. Ignition OFF, remove the control valve body cover. Refer to Control Valve Lower Body and Upper Body Replacement .
  2. Connect the TCM harness connector.
  3. Disconnect the output speed sensor (OSS) harness connector from the control solenoid (w/body and TCM) valve assembly.
  4. Connect the J 38522:  variable signal generator between the supply voltage terminal B and OSS signal terminal A at the control solenoid (w/body and TCM) valve assembly. Refer to Control Solenoid Valve and Transmission Control Module Assembly Output Shaft Speed Input Test for further instructions.
  5. Set the J 38522:  variable signal generator signal to 8 volts, the frequency to 120 and the percent duty cycle to 50.
  6. Ignition ON, observe the scan tool Transmission OSS parameter. The scan tool Transmission OSS parameter should be between 100-400 RPM.
    • If not the specified value, replace the control solenoid (w/body and TCM) valve assembly.
  7. Test the output speed sensor harness for an open, short to ground or short to voltage.
    • If all circuits test normal, test or replace the output speed sensor.