LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2002 >> Blazer 4D Utility, 4WD, Part Time >> Repair and Diagnosis >> External Pages >> Different car >> Section 1967 (Hybrid Energy Storage System - 2.4L (Hp7)) >> Repair Instructions >> 175 Amp Mega Fuse Replacement >> Installation Procedure

Installation Procedure

WARNING: This page is about a different car, the 2009 Saturn Vue. However, it is still accessible from the selected car via links, so may be relevant.
    Fig 1: Battery Positive Cable Fuse Nuts And Bolt
    GM1998566Courtesy of GENERAL MOTORS CORP.
  1. Install the 175 mega amp fuse (3) and the battery positive cable (3).
  2. CAUTION: Refer to Fastener Caution .
  3. Install the battery positive cable bolt (2) and nut (1) and tighten to 10 N.m (89 lb in).
  4. Fig 2: Generator Control Module Cover Bolts And Cover
    GM1998181Courtesy of GENERAL MOTORS CORP.
  5. Install the generator control module cover bolts (1) and cover (2) and tighten the bolt to 10 N.m (89 lb in).
  6. Fig 3: ECM Bracket
    GM1998167Courtesy of GENERAL MOTORS CORP.
  7. Install the ECM bracket (3), bolts (1) and nuts (2) and tighten the nuts to 10 N.m (89 lb in).
  8. Fig 4: Battery Positive Cable Jumper Block, & ECM & TCM Electrical Connectors
    GM1998156Courtesy of GENERAL MOTORS CORP.
  9. Connect the ECM electrical connectors (2) and the TCM electrical connectors (3).
  10. Clip in the battery positive cable jumper block (1) to the ECM bracket (4).
  11. Connect the hybrid battery. Refer to Hybrid Battery Service Disconnect/Connect .