Circuit/System Verification
WARNING: This page is about a different car, the 2009 Saturn Vue. However, it is still accessible from the selected car via links, so may be relevant.
Observe the scan tool BECM Hybrid Battery 1, Hybrid Battery 2 and Hybrid Battery 3 parameters while road testing the vehicle. The voltage difference between the battery voltages should be within 0.75 volts.