LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2002 >> Blazer 4D Utility, 4WD, Part Time >> Repair and Diagnosis >> External Pages >> Different car >> Section 1932 (Hybrid Energy Storage System - 3.6L (Hp5)) >> Repair Instructions >> Hybrid Battery Service Disconnect/Connect >> Installation Procedure

Installation Procedure

WARNING: This page is about a different car, the 2009 Saturn Vue. However, it is still accessible from the selected car via links, so may be relevant.
    Fig 1: Installing Service Disconnect
    GM2165343Courtesy of GENERAL MOTORS CORP.
  1. Install the service connect (1).
  2. Fig 2: Sliding Service Connect To Latched Position
    GM2164764Courtesy of GENERAL MOTORS CORP.
  3. Slide the service connect (1) to the latched position.
  4. Perform the High Voltage Enabling procedure. Refer to High Voltage Enabling